BIM Quality Assurance

As a project integration consultant, CASE evaluates models based on key performance indicators defined at the onset of the project.  CASE has developed several tools that allows us to audit a single model, or many at once, and report back to the client.  CASE has worked with clients to help them visualize model data in ways that can help better manage assets held within a model.  These processes are typically applied whenever a change in model stakeholders occurs, such as design to construction, or construction to facility management.

Related Projects

Firmwide BIM Standards and Component Library

As part of a firmwide transition to BIM, Ennead Architects needed to convert an existing CAD detail library from MicroStation to

Structure Tone Headquarters Renovation

Structure Tone chose to utilize BIM to coordinate all disciplines and trades for the renovation of their primary office space in

Officewide BIM Training and Support

CASE was hired by Cannon Design’s New York office to support their emphasis on BIM and model-based project delivery. CASE

Porter Replacement Hospital

Robins and Morton (R&M) wanted to derive additional value from the comprehensive BIM the company was using to coordinate the

Nationwide BIM Services IDIQ

CASE, as part of a team led by View By View of San Francisco, was awarded a General Services Administration (GSA) National

Energy Modeling Support

Energent Solutions, working with DesignGroup, needed to produce a BIM-based energy model of existing office buildings in order to

3ds Max 2010 Architectural Visualization: Advanced to Expert Book

3D Architectural Training Solutions, the world’s foremost design visualization publications and training company, needed a

Firmwide BIM Guides

With experience using BIM on numerous projects, Bohlin Cywinski Jackson (BCJ) needed to develop consistent methods implementing

Officewide BIM Training and Support

CASE was hired by Kohn Pedersen Fox to provide officewide BIM support for the New York office. CASE provided regular project-

Fenerbahçe Ülker Arena

With a façade package due in one month, CASE was brought in to assist Development Design Group in the definition,

New York University Langone Medical Center Master Plan

Ennead Architects and NBBJ needed a process to effectively manage nearly 3 million square feet of existing space as part of a

Basrah Sports City

With construction underway, CASE was hired by 360 Architecture to provide geometry definition, design rationalization and BIM